Buildout tracker · Project

Stargate Abilene (Lancium Clean Campus)

1.2 GW planned AI data center in Abilene, Texas, developed by Crusoe (developer) / Oracle for OpenAI.

Developer / operator
Crusoe (developer) / Oracle
Tenant
OpenAI
Location
Abilene, Texas, USA
Planned capacity
1.2 GW
Announced capex
n/a
Power
On-site natural gas turbines plus ERCOT grid (wind); 1 GW substation
Status
partially operational
Announced
2025-01-21
Notes
Planned 2 GW expansion was dropped in March 2026. On-site gas plant permitted for more than 1.6M tons of GHG per year (Texas Tribune).