Buildout tracker · Project

Meta Hyperion

5 GW planned AI data center in Holly Ridge, Louisiana, developed by Meta (JV with Blue Owl) for Meta.

Developer / operator
Meta (JV with Blue Owl)
Tenant
Meta
Location
Holly Ridge, Louisiana, USA
Planned capacity
5 GW
Announced capex
$50B
Power
Meta-funded Entergy gas plants, grid batteries, nuclear uprates, Entergy PPAs
Status
under construction
Announced
2024-12-04
Notes
Entergy gas buildout for the campus reported at up to 10 plants totaling 7.5 GW (Fortune, March 2026), paired with up to 2.5 GW of renewables and storage.