Meta Hyperion
5 GW planned AI data center in Holly Ridge, Louisiana, developed by Meta (JV with Blue Owl) for Meta.
- Developer / operator
- Meta (JV with Blue Owl)
- Tenant
- Meta
- Location
- Holly Ridge, Louisiana, USA
- Planned capacity
- 5 GW
- Announced capex
- $50B
- Power
- Meta-funded Entergy gas plants, grid batteries, nuclear uprates, Entergy PPAs
- Status
- under construction
- Announced
- 2024-12-04
- Notes
- Entergy gas buildout for the campus reported at up to 10 plants totaling 7.5 GW (Fortune, March 2026), paired with up to 2.5 GW of renewables and storage.